Drone Shot of a Solar Farm.

Solar Mounting Twin Post Pile Driven System, Wales, 2024.

Drone shot of a Solar Farm.

2.1MW Single Post Pile Driven Solar Farm, Gloucester, 2024.

Drone shot of a Solar Farm.

1.7MW Pile Driven Solar Farm, 2024.

Solar Carport over a car park.

Bluetop Solar Carport, Oswestry, 2024.

Close up of well aligned panel breaks on a solar farm.

Precision Aligned Panellling

Drone Shot of a Solar Farm

Ballast Mounted Appex Style East-West Solar System, Scotland, 2024.

Image of a Solar Farm

Screw Piled Mounted Solar Farm, Exeter, 2024

Image of a Solar Farm

Solar Mounting Ballast System, 2024, Suffolk

Construction site with steel framework and vehicles on dirt ground under cloudy sky.

The start of the  Worlds first electric forecourt built using the Bluetop Opti 2 system.

Modern solar-powered electric vehicle charging station with multiple bays.

 The Worlds first electric forecourt 

Large solar panel array installed outdoors under cloudy sky.

191kW installation for Ministry of Defence

Solar panels installed on a grassy field under a clear blue sky.

111kW system for Ministry of Justice, our first of five sites to be installed across the UK

Empty solar panel frames on a grassy field under cloudy sky.

250kw installation, Suffolk.

Complete

This 126kw is the second site complete for this client in Suffolk.

Pull testing for a 5MW site

25kW carport installation for Thales to assitst with reducing their carbon footprint

We cover all your O&M needs including panel cleaning and grass cutting

A nice aerial shot of this 1.8MW site in Somerset

1.3MW Tree Systems installation, Peterborough.

Complete

150kW installation to help reduce the carbon footprint of this farm shop

25kW Bluetop Opti A installation for an innovation hub in Kilmarnock, Scotland

Complete

Welsh Water Treatment Works, 496kW Sadef East West System.

150kW  installation @ 30°

Completed

446kW Anglian Water Treatment Works installation using Hi-Tech Resourcing twin post 4 in landscape system.

Completed.

Ricoh Factory, 396kw install 

Completed 

LED lighting is another positive for carport installations

421kw site in Kent.

Completed

This project is part of the Scottish Assembly Governments’ electric highway scheme introducing 5 charging hubs along the M9.

Completed

Roadway construction underway for site access

Last delivery of stone 

This 1MW ballasted installation is on contaminated land and will generate power for a University in Scotland.

Roadway finished after solar installation has been completed

120kw install, Amazon Chester to assist with reducing their carbon footprint

ABP 5 MW,  Barry Docks South Wales

United Utilities 1MW, Stockport

Sutton County Council 138kw 

Sutton County Council Carport Complete

PSH 500KW  Complete, Devon

United Utilities 359KW, Sutton Hall

United Utilities Sutton Hall complete

Solar Century 12.3MW , Chediston Suffolk